現澆水磨石樓地面工程安全作業交底.doc
進入下載頁
內容摘要:
1、 進入施工現場必須遵守信達建筑工程有限公司的各項規章制度和紀律。
2、 在室內推小車時,特別是在過道中拐彎時要注意小車把擠手。人推小車不準倒退。
3、 夜間作業要有足夠的照明并經二級漏電保護。
4、 燈具應架空并用支架固定,離地面不低于2.4m。不得隨便移動臨時照明。
5、 使用磨石子機,應戴絕緣手套、腳穿膠鞋。
6、 電源線須經過二級漏電保護并用橡皮電纜線,且不得有接關頭現象。
7、 三角磨石必須安裝牢固并有防護罩,經試運轉正常后方可操作,不得在運轉時進行保養。
8、 擦草酸時人人都要佩戴膠皮手套,以免傷手。
9、 磨石機上方不準站人或堆物。
10、井架吊籃提升或下降時,必須關好井架安全門。
11、卸料平臺處的操作工人,不得將頭、手伸入井架內。
12、卸料平臺處的操作工人應待井架停穩后,方可進入吊籃內工作。
13. 嚴禁操作人員在酒后進入施工現場作業。
14、每個工人進入施工現場都必須頭戴安全帽。
15、班組如果因勞力不足需要再招新工人時,應事先向工地報告。
16、新工人進場后應先經過三級安全交底,并經考試合格后方可讓其正式上崗。
17、新工人進場應具有四證,即:職業資質證、身份證、計劃生育證和外來人口暫住證。
Abstract:
1, into the letter reached the construction site must comply with the rules and regulations Construction Co., and discipline.
2, push a small car in indoor, in particular when turning in the aisle of the crowded car to pay attention to hand. Pushed trolleys are not allowed back.
3, adequate lighting at night operations by the two leakage protection.
4, lamps should be elevated and fixed with a stent, from the ground no less than 2.4m. Shall not be removed without any temporary lighting.
5, using terrazzo machine, should wear gloves, be wearing shoes.
6, the power cord to go through two leakage protection and rubber cables, and may not have access juncture phenomena.
7, triangular terrazzo must be installed securely and with protective cover, the rear by the commissioning normal operational, maintenance when not in operation.
8, wiping the oxalic acid must wear rubber gloves all the time, to avoid hurting the hand.
9, terrazzo machine or the top of the heap objects are not allowed to stand.
10, Derrick raise or lower the basket, you must turn off the derrick safety gate.
11, unloading platform Department's workers, not the head, hands stuck inside the derrick.
12, unloading platform Department's workers should be Derrick a parked, before working into the basket.
13. Non-operators in the drink to the construction site work.
14, each worker entering the construction site must be wearing helmets.
15 team if the need to move because of a labor shortage of new workers, the report shall be submitted to the site.
16, after the admission of new workers should go through three security correspondent, and pass the examination before they can let the official posts.
17, the new approach should have four cards of workers, namely: professional qualification certificate, identity cards, birth certificates and residence permits.