      1.工程概況
      第29屆奧運會青島國際帆船中心陸域建筑Ⅱ標段奧運村工程位于燕兒島路1號,本工程裙房四層(局部一層),裙房以上托兩個17層高層建筑和兩個7層多層建筑共四個單體工程,地上一層層高6米,二層層高5米,三層及以上層高3.5m,地上建筑面積58921m2,含二層地下室總建筑面積為89296m2,兩個17層建筑總高度為77.116米,兩個7層建筑總高度為30.9米。
      2.外腳手架搭設方案選擇
      根據本工程的特點,主要考慮在主體施工期間及裝修階段的安全防護,保證工程順利進行,設計使用外腳手架的施工搭設方案:
      裙房四周及主樓無裙房的部位采用落地式雙排扣件式鋼管腳手架搭設方案,兩個17層高層施工過程中設兩道懸挑外腳手架,分別從主樓6層頂和13層頂開始設置,兩個7層建筑采用落地式雙排腳手架。腳手架均為全封閉封圈形,以密目安全網在腳手架外排內側封閉。腳手架內側立桿離外墻面≤350㎜,立桿橫向間距900㎜,縱向間距1800㎜,大橫桿步距1800㎜,操作層1. Project Overview
      29th Olympic Games in Qingdao International Sailing Center Land Building Ⅱ Olympic Village project is located at Lot 1, Majoring in Island Road, the project podium four (local level), skirt over care of two 17 storey buildings and two 7 layer multi-layer construction of four single projects on the ground floor storey 6 meters, 5 meters in the second floor storey, three storey above 3.5m, ground floor area of 58921m2, two-story basement with a total construction area of 89296m2 , two 17-storey building total height of 77.116 meters, two 7-story building total height of 30.9 meters.
      2. External Scaffolding Selection
      According to the characteristics of this project, the main considerations during the construction and decoration in the main phase of the security, to ensure the smooth progress of projects, designed for use outside the construction scaffold erection program:
      Skirt around the podium and main building of the site without using double-breasted floor piece Scaffolding program, two 17-story high-rise construction in the scaffolding set up outside two cantilever, respectively, from the main building of 6 floors and 13 floor roof top of the beginning set, two 7-story building with floor double scaffold. Scaffolding are completely closed seal ring-shaped head to close a safety net efflux in the medial scaffold closed. Scaffolding outside the wall from the inside pole ≤ 350 mm, pole spacing of 900 mm horizontal and vertical spacing of 1800 mm, 1800 mm away from the big bar step, the operation level

       

      下載地址

      前往下載

      主站蜘蛛池模板: 婷婷久久久| 亚洲男人天堂网2014av| 亚洲大尺度无码无码专线| 久久精品国产99亚洲精品| 免费vA片| 伊在人间香蕉最新视频| 亚洲男人的天堂视频| 久久综合伊人77777| 国产伦一区二区三区久久| 欧美激情一区二区| 18国产午夜福利一二区| 亚洲精品国产亚洲精品| 最新偷拍一区二区三区| 亚洲区一区二区激情文学| 国产成人十八黄网片| 免费无码又爽又刺激高潮的视频网站| 99国产成人综合久久精品| 国产成人av一区二区三| 亚洲色人| 天堂亚洲网| 亚洲综合无码AV在线观看| 99久久久无码国产精品9| 亚洲人成伊人成综合网小说| 综合在线 亚洲 成人 欧美| 亚洲精品在线观看中文字幕| 欧美一区二区三区久久综合| 桦甸市| 插插无码视频大全不卡网站| 亚洲 欧美 日韩 第三区 | 亚洲国产美女精品久久久| 国内精品久久久久影院蜜芽| 久爱av| 色综合久久久中文字幕精品1| 丰满老熟好大bbb| 日韩卡1卡2卡三卡免费网站| 人人妻人人妻人人片色av| 内射影院| 成在线人av免费无码高潮喷水| 亚洲精品一,二,三,四区AV| 丝袜国偷自产中文字幕| 色综合天天综合网国产成人网|