      資料簡介

      一、工程概況
      本工程位于×××××小區(qū)西區(qū)15、17、20#住宅樓工程位于北京市××區(qū)××村。北臨規(guī)劃××二號(hào)路。總建筑面積為50803m2。地下二層為五級(jí)普通人防,地下一層為設(shè)備間、自行車庫和管理用房,地上為住宅。
      北京市地區(qū)的雨季施工為6月-8月,該季節(jié)的歷史平均降雨量為423mm,占北京市年平均降雨量的74%。期間有數(shù)次的大到暴雨天氣,局部地區(qū)可能出現(xiàn)洪澇災(zāi)害。因此雨季施工時(shí),應(yīng)與當(dāng)?shù)貧庀蟛块T密切聯(lián)系,注意收聽當(dāng)?shù)靥鞖忸A(yù)報(bào),做好預(yù)防準(zhǔn)備工作。
      二、雨季施工原則
      本工程雨季施工階段要完成主體結(jié)構(gòu)和二次結(jié)構(gòu)的施工。施工任務(wù)繁重,為確保工程質(zhì)量,搞好安全生產(chǎn),保證各項(xiàng)計(jì)劃指標(biāo)任務(wù)的完成,必須從思想上、組織上、措施上、物資上盡早做好充分準(zhǔn)備,做到思想落實(shí)、組織落實(shí)、措施落實(shí)、物資落實(shí)、汛期施工做到有備無患,雨季施工總的原則是“做好排水、擋水、防水工作”,總的要求是,室內(nèi)工程雨季不影響施工,室外工程小雨不間斷施工,大雨期間暫停施工,大雨過后即可施工,暴雨過后不影響施工。
      三、施工準(zhǔn)備
      3.1 組織準(zhǔn)備
      為了保證在雨季施工期間,在發(fā)生大雨、暴雨天氣等險(xiǎn)情時(shí),能夠及時(shí)組織人員進(jìn)行搶險(xiǎn)救災(zāi),成立雨季施工領(lǐng)導(dǎo)小組。
      組長:×××
      副組長:×××、×××
      組員:×××、×××、×××、×××、××、×××、××、×××
      3.2 材料準(zhǔn)備 序號(hào) 材料名稱 單位 數(shù)量 備注 1 雨衣雨褲 套 200 2 雨鞋 雙 200 3 污水泵 臺(tái) 8 4 塑料布 M2 1500 5 鐵鍬 只 100 6 手推車 輛 30 7 防水電纜 m 500 8 編制袋 個(gè) 1000   3.3 技術(shù)準(zhǔn)備
      雨季到來之前,組織有關(guān)人員按照方案要求進(jìn)行技術(shù)交底,提出雨施計(jì)劃,為施工提供技術(shù)準(zhǔn)備。
      3.4 現(xiàn)場準(zhǔn)備
      First, project survey
      The project is located ××××× Western 15,17,20 # residential building residential project in the District, Beijing, × × × × village. × × II Road north plan. The total construction area of 50803m2. Basement level for the five common air defense, ground floor for the equipment, the bike library and administration buildings, land for residential.
      Construction of Beijing area during the rainy season in June -8 for the month, the season's historical average rainfall 423mm, mean annual precipitation in Beijing accounted for 74%. There have been several rounds of heavy rain the weather, flooding may occur in some areas. Therefore, construction during the rainy season, should be closely linked with the local meteorological department, pay attention to listen to local weather forecasts, preventive preparations.
      Second, the construction principle of the rainy season
      Construction phase of this project to be completed during the rainy season the main structure and secondary structure of the project. Heavy construction tasks, in order to ensure the quality, improve safety, ensure that the plan targets completion of the task, must be ideologically, organizationally, measures and material as soon as possible fully prepared to do to implement it, the organization and the measures implemented, the implementation of materials, construction prepared and flood season, the rainy season the general principle of construction is "good drainage, retaining, waterproof work", the general requirement is that the rainy season does not affect the construction of indoor projects, outdoor projects ongoing construction of light rain, heavy rain During the suspension of construction, the construction can be heavy rain, rainstorm does not affect the construction.
      Third, construction preparation
      3.1 Organization of preparation
      To ensure the construction period in the rainy season, in the event of heavy rain, heavy rain and other dangerous situations, the timely rescue and relief organization personnel, the establishment of the Leading Group for Construction during the rainy season.
      Leader: × × ×
      Deputy head of the :×××,×××
      Crew :×××,×××,×××,×××,××,×××,××,×××
      3.2 Materials preparation material name number number of units Note 1 raincoat rain boots rain pants sets 2002 double 2003 sewage pump station 84 plastic sheeting M2 1500 5 100 6 spade only waterproof cable trolley car 307 m 500 8 1000 3.3 Technical preparation of bags were ready
      Before the rainy season, were organized to carry out technical disclosure in accordance with program requirements, make rain facilities plan to provide technical preparations for the construction.
      3.4 site preparation
       

      下載地址

      前往下載

      主站蜘蛛池模板: 午夜无码av| 国产女精品视频网站免费| 狠狠躁夜夜躁人人爽天天古典| 91小电影| 国产美女裸身网站免费观看视频| 国产精品2022最新在线观看| 久久天天躁狠狠躁夜夜躁2012| 97av麻豆蜜桃一区二区| 久久精品国产亚洲av高| 看亚洲一级黄色片啪啪啪| 无码人妻斩一区二区三区 | 国产精品成人一区二区不卡| 久久精品国产亚洲av熟女| 人妻一区二区三区三区| 东京热一区二区三区在线| 亚洲AV无码成人精品区欧洲| 久久亚洲精品中文字幕三区| 人妻人人澡人人添人人爽人人玩| 国产综合色产在线视频欧美| 久久一级精品久熟女人妻| 中文字幕人妻系列| 国产热A欧美热A在线视频| 中文日韩在线一区二区| 欧美日韩国产专区一区二区| 欧美色女人| 一区二区三区国产不卡| 欧美高清一区三区在线专区| 专干老肥熟女视频网站| 一本色道综合久久欧美日韩精品| 国产99久久精品一区二区| 真实国产乱子伦视频| 中国少妇人妻xxxxx| 国产午夜精品福利免费不| 黄色av电影| 亚洲欧美日韩综合一区在线| 欧美成人精品无码| 国产精品久久av黄片| 尤物TV国产精品看片在线| 婷婷四虎东京热无码群交双飞视频| 亚洲国产成人无码影片在线播放| 亚洲综合社区|