71專業(yè)性較強項目安全施工組織設(shè)計(方案).doc
進入下載頁
目 錄
(1)臨時用電工程
(2)腳手架工程
(3)基坑支護
(4)模板工程
(5)起重吊裝作業(yè)
(6)塔式起重機
(7)物料提升機
(8)其他垂直運輸設(shè)備
(9) 冬季施工安全技術(shù)措施
1臨時用電工程
1.1 一 般 規(guī) 定
1.1.1 電工作業(yè)必須經(jīng)專業(yè)安全技術(shù)培訓,考試合格,持《北京市特種作業(yè)操作證》(外埠來京從事電工作業(yè)的人員,必須持原所在地地(市)級以上勞動保護安全監(jiān)察機關(guān)核發(fā)的特種作業(yè)證明,并申請換領(lǐng)《北京市特種作業(yè)臨時操作證》)方準上崗獨立操作。非電工嚴禁進行
CONTENTS
(1) Temporary power project
(2) Scaffolding works
(3) Foundation Support
(4) template works
(5) Crane lifting operations
(6) tower crane
(7) material hoist
(8) other vertical transportation equipment
(9) Winter Construction Safety Measures
A temporary power project
1.1 General requirements
1.1.1 Electrical work must be approved by the professional security training, examination, and hold "Permit for special operations in Beijing" (other ports to Beijing to engage in electrical work of the staff, must hold the original location (city) level and above the protection of labor safety supervision authorities issued that special operations, and application for renewal of "temporary operating permit special operation in Beijing"), are allowed to operate independently posts. Non-electrical strictly prohibited
