無(wú)錫天山粉磨站建設(shè)工程腳手架搭設(shè)專(zhuān)項(xiàng)安全施工方案.doc
進(jìn)入下載頁(yè)資料簡(jiǎn)介
本工程位于王介門(mén)村,由天山水泥有限公司投資粉磨站工程,由水泥粉磨、水泥庫(kù)、包裝房、配電房及控制室、粉煤灰?guī)臁⑴淞蠋?kù)、破碎房、熟料庫(kù)八個(gè)單體組成。
根據(jù)實(shí)際情況,以熟料庫(kù)為編制對(duì)象總高度為25米的外腳手架,密目網(wǎng)圍護(hù)。
The project is located at King Kai Mun Village, Tianshan Cement Co., Ltd. invested by the Grinding Station project, from the cement grinding, cement silo, packing house, power distribution room and control room, fly ash Library, ingredient database, broken house, clinker library composed of eight monomers.
According to the actual situation in order for the preparation of the object clinker storage total height of 25 meters outside the scaffold, dense mesh enclosure.
下載地址
