      本工程屋面采用珍珠巖保溫,SBS防水卷材結(jié)合防水涂膜聚氨酯防水層。
      一、施工程序:
      基層清理→管道堵洞、找平層→涂膜防水層→彈線→找坡層→保溫層鋪設(shè)→找平層→卷材防水層→面層。
      施工要點(diǎn):
      1:8水泥珍珠巖找坡:找坡坡度為2%,操作前應(yīng)在女兒墻上彈出標(biāo)明珍珠巖鋪設(shè)的厚度及坡度,另外,在屋頂做出找坡灰餅,以示珍珠巖鋪設(shè)的厚度及坡度。鋪設(shè)由高向低,最低處不得低于40mm。找坡層施工完畢,鋪設(shè)100厚水泥珍珠巖保溫塊。
      二、 卷材防水卷材施工
      1、材料及要求:
      防水卷材材料應(yīng)具有出廠合格證或廠家產(chǎn)品的認(rèn)證文件,材料進(jìn)場后做復(fù)試,合格后方可使用。
      2、主要機(jī)具:汽油噴燈、攪拌桶、滾刷、剪刀、壓滾、清理工具等。
      3、作業(yè)條件:
      (1)基層應(yīng)按設(shè)計(jì)要求抹好找平層,要求抹平、壓光、堅(jiān)實(shí)平整、不起砂,不空鼓,坡度符合設(shè)計(jì),無積水現(xiàn)象。
      (2)基層應(yīng)基本干燥,含水率低于8%。
      This works with perlite roof insulation, SBS waterproofing membrane combined with waterproof polyurethane waterproofing coating.
      First, the construction process:
      → pipe plug hole grassroots clean-up, leveling layer of waterproof coating layer → → → elastic line to find slope laying insulation layer → → → leveling layer of waterproof layer → membrane surface.
      Construction Highlights:
      1:8 cement perlite to find slope: find slope gradient of 2%, operating before the wall in her pop-up marked the laying of the thickness and slope of perlite, also made in the roof slope to find ash cake, to show the laying of perlite thickness and slope. Laying from high to low, the lowest point not less than 40mm. Find slope layer construction is completed, the laying of 100 thick concrete perlite insulation block.
      Second, membrane waterproofing membrane construction
      1, material and requirements:
      Waterproofing membrane material should have the factory certificate or certification of products from documents and materials to do re-testing after admission, qualified before use.
      2, the main equipment: gas burner, stirring drum, roller brush, scissors, pressure roller, cleaning tools.
      3, the operating conditions:
      (1) primary design requirements should be smeared with leveling layer, required disappearing, the pressure of light, solid formation, can not afford to sand, not void, slope consistent with the design, no water phenomenon.
      (2) basic primary should be dry, moisture content below 8%.
       

      下載地址

      前往下載

      主站蜘蛛池模板: 中国少妇嫖妓BBWBBW| 又硬又粗又大一区二区三区视频| 色吊丝中文字幕在线观看| 亚洲AV色图| 夜夜高潮天天爽欧美| 亚洲AVAV天堂AV在线网阿V| 色噜噜人妻丝袜AⅤ资源| 永久免费mv入口| 印度AV网| 亚洲国产综合日韩AV一波多野结衣 | 国产黑色丝袜在线观看片不卡顿| 人人妻人人狠人人爽天天综合网| 69老司机精品视频免费观看| 国产精品亚洲精品日韩已方| 少妇无套内谢免费视频| 热久久这里是精品6免费观看| 国产成人免费无码视频在线观看| AV最新高清无码专区| 国产区h| 伊在人香蕉99久久| 手机无码人妻一区二区三区免费| 欧美A∨| 上饶县| 国产精品久久久久9999赢消| 妺妺窝人体色www聚色窝仙踪| 无码人妻精品一区二区三区9厂| 日本一区二区高清国产| 久久综合给合久久狠狠狠| 久久国产精品波多野结衣av| 久久久综合亚洲色一区二区三区 | 精品少妇人妻av一区| 2024男人天堂| 在线涩涩免费观看国产精品| 沈丘县| 亚洲 制服 丝袜 无码| 国产仑乱无码内谢| 97无码精品人妻免費一区二区| 亚洲永久精品免费www52zcm男男| 日韩精品中文字幕一线不卡 | 忘忧草影视| 蜜桃av在线|