季節(jié)性施工措施.doc
進入下載頁資料簡介
季節(jié)性施工措施
1、雨季施工的措施:
⑴施工前對整個工程的排水系統(tǒng)進行統(tǒng)一規(guī)劃和安排,確保施工期間與完工后的排水暢通,進行樁基施工前,沿建筑物四周設(shè)置縱向邊溝,盡量將臨時排水系統(tǒng)與永久性設(shè)施相結(jié)合。
⑵在人工樁基礎(chǔ)施工
Seasonal construction measures
1, the rainy season the construction of measures:
⑴ the entire project before construction of the drainage system of unified planning and arrangements to ensure that during construction and after completion of the drainage flow, to conduct pre-construction pile, set vertically along the ditch around the building, as far as possible facilities for the temporary drainage system and the permanent phase combination.
⑵ pile foundation construction in artificial
下載地址
