鋼管落地卸料平臺(tái)計(jì)算書
某某大廈工程;屬于框架結(jié)構(gòu);地上0層;地下0層;建筑高度:0.00m;標(biāo)準(zhǔn)層層高:0.00m ;總建筑面積:0.00平方米;總工期:0天;施工單位:某某施工單位。
本工程由某某房開公司投資建設(shè),某某設(shè)計(jì)院設(shè)計(jì),某某堪查單位地質(zhì)勘查,某某監(jiān)理公司監(jiān)理,某某施工單位組織施工;由章某某擔(dān)任項(xiàng)目經(jīng)理,李某某擔(dān)任技術(shù)負(fù)責(zé)人。
扣件式鋼管落地平臺(tái)的計(jì)算依照《建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范》
Steel floor unloading platform calculations
Certain building works; is frame structure; ground 0 level; G 0 floor; building height: 0.00m; standard layers of high: 0.00m; total construction area: 0.00 square meters; Total duration: 0 days; construction unit: XX construction unit.
The project investment by the construction of a certain room to open, a certain institute design, so and so worthy of investigation unit of geological prospecting, supervision of such and such a Project Management Company, certain construction unit of construction; by the Chapter so and so as a project manager, Li Moumou as Technology Leader.
Steel tubular landing platform are calculated according to "construction steel tubular scaffold safety technical specifications"