一、 施工準(zhǔn)備
(一) 作業(yè)條件
1、 由建設(shè)、監(jiān)理、施工、勘察、設(shè)計單位進(jìn)行地基驗槽,完成驗槽記錄及地基驗槽隱檢手續(xù),如遇地基處理,辦理設(shè)計洽商,完成后由監(jiān)理、設(shè)計、施工三方復(fù)驗簽認(rèn)。
2、 完成基槽驗線手續(xù)。
(二) 材料要求
1、 水泥:根據(jù)設(shè)計要求選水泥品種、強(qiáng)度等級;若遇有侵蝕性介質(zhì),要按設(shè)計要求選擇特種水泥;有產(chǎn)品合格證、出廠檢驗報告及快測試驗報告。
2、 砂、石子:有進(jìn)場復(fù)驗報告,質(zhì)量符合現(xiàn)行標(biāo)準(zhǔn)要求。
3、 水:采用飲用水。
4、 外加劑、摻合料:根據(jù)設(shè)計要求通過試驗確定。
5、 預(yù)拌混凝土所用原材料須符合上述要求,必須具有出廠質(zhì)量證明文件、檢測報告、原材試驗報告。
6、 鋼筋要有產(chǎn)品合格證、出廠檢驗報告和進(jìn)場復(fù)驗報告。
(三) 施工機(jī)具
攪拌機(jī)、磅秤、手推車或翻斗車、鐵鍬、振搗棒、刮桿、木抹子、膠皮手套、串桶或溜槽等。
二、 質(zhì)量要求
(一) 鋼筋工程
(二) 模板工程
(三) 混凝土工程
注:(一)、(二)、(三)項具體要求請參照本書“箱型
First, construction preparation
(A) Operating conditions
1, by construction, supervision, construction, survey and design units of foundation ditch, complete tank inspection records and inspection procedures implicit foundation ditch, case treatment, process design negotiations, completion of the supervision, design, construction and three-retest sign recognition.
2, complete the foundation trench line inspection procedures.
(B) material requirements
1 cement: cement varieties selected under the design requirements, the intensity level; In case of aggressive media, in accordance with the design selection of special cement; have product certification, factory test reports and inspection reports faster test.
2, sand, stones: report of a retest approach, quality meets current standards.
3, Water: using water.
4, admixtures, admixtures: According to the design requirements determined by experiments.
5, ready-mixed concrete raw materials used to meet the above requirements, must have a factory quality documents, test reports, raw material test report.
6, steel products have certification, factory inspection report and the approach reinspection report.
(C) Construction equipment
Blenders, scales, trolleys, or dump trucks, shovels, vibration rods, scraping rods, wooden trowel, rubber gloves, bucket, or chute, etc. series.
Second, the quality requirements
(A) of the steel works
(B) of the formwork
(C) Concrete Works
Note: (a), (b), (c) specific requirements, please refer to the book "Box