1. 作業(yè)前,必須將要拆除的建筑物的電線、上下水管道、煤氣管道、電話線等先切斷或遷移。
2. 有高血壓、貧血、恐高癥等疾病的人嚴(yán)禁作業(yè)。
3. 作業(yè)前必須先戴安全帽、防護(hù)眼鏡,系安全帶,穿工作鞋,站在穩(wěn)固的結(jié)構(gòu)部位上操作。
4. 要有牢固的圍護(hù)措施,封閉要嚴(yán)密,不能有孔洞,防止磚、石等飛濺到地面?zhèn)恕?br />
5. 拆除時(shí)應(yīng)自上而下進(jìn)行,禁止數(shù)層樓同時(shí)拆除。當(dāng)拆除某一部位時(shí),應(yīng)防止其他部位發(fā)生坍塌。作業(yè)下方設(shè)警戒,并掛標(biāo)識(shí)牌。
6. 不行在高壓線、裸線邊干活,且要有隔離措施。
要檢查鐵錘等是否安全牢固,有松動(dòng)的不能使
Removal Safety Technology Details
1. Operation prior to the removal of the buildings to be wires, up and down the water pipelines, gas pipelines, telephone lines, and the first cut or relocated.
2. Have high blood pressure, anemia, fear of heights and Huntington's diseases were non-operational.
3. Work needed to be wearing helmets, safety glasses, seat belt, working boots, standing on the structure of a solid part of the operation.
4. To have a solid enclosure measures, closed to tight, can not have holes to prevent the brick and stone flying to the ground assault.
5. Removal should be from top to bottom, the number of floors at the same time prohibiting removal. When the removal of a site should be to prevent the occurrence of other parts of the collapse. Operating below the set warning and hanging signage.
6. No in the high voltage, bare edge work, and quarantine measures should be.
To check whether the security firm hammers, etc., are not so loose