腳手架拆除安全技術交底
⒈拆除腳手架前,班組成員要明確分工,統一指揮,操作過程中精力要集中,不得東張西望和開玩笑,工具不用時要放入工具袋內。
⒉正確穿戴好個人防護用品,腳應穿軟底鞋。拆除挑架等危險部位要掛安全帶。
⒊拆除腳手架前,周圍應設圍欄或警戒標志,在交通要道設專人監護,禁人入內。
⒋嚴格遵守拆除順序,由上而下,一步一清,不準上下層同時作業。
⒌拆除腳手架的大橫桿、剪刀撐,應先拆中間扣,再拆兩頭扣,由中間操作人往下順桿子,不得往下亂扔。
⒍拆除的腳手架桿、腳手板、鋼管、扣件等材料應往入傳遞或用繩索吊下,不得往下投扔,以免傷人和不必要的損失。
⒎拆除過程中最好不要中途換人,如必須換人時,應將拆除情況交代清楚。
⒏拆除過程中最好不要中斷,如確需中斷應將拆除部分處理清楚告一段落,并檢查是否會倒塌,確認安全后方可停歇。
⒐腳手架拆除完后應將架料分類堆放,堆放地點要平坦,下設支墊排水良好。鋼類最好放置室內,堆放在室外應
Scaffolding Safety Technology Details removal
⒈ dismantle scaffolding before, team members must have a clear division of labor, unity of command and effort should be concentrated during the operation, not looking around and joke, tools, tool bag when not in place.
⒉ Wear proper personal protective equipment, foot wear soft shoes. Removal of aircraft and other dangerous parts of pick belts to hang.
⒊ dismantle scaffolding before, around the fence or warning signs should be located in the travel corridors hand care, ban people from entering.
⒋ strictly abide by the removal order, from top to bottom, step one clear, closed upper and lower simultaneous operation.
⒌ dismantling scaffolding large bar, scissors, should split the middle button, and then split two buttons, the operator down along the middle pole, not down to throw.
⒍ removal of scaffolding poles, scaffold boards, pipes, fasteners and other materials should be delivered or used rope to hang into the next, can not throw down the investment to avoid injury and unnecessary losses.
⒎ removal process is best not to halfway substitutions, such as the need to replace him, should remove the situation clearly.
⒏ removal process is best not to interrupt, if it proves necessary removal of part of the treatment interruption should clearly come to an end, and check whether it will collapse, that it is safe before they can stop.
⒐ After removal of scaffolding material should be classified stacking frame, stacking location to be smooth, support cushion consists of good drainage. Steel class best place indoors, outdoors should be stacked