大連海佳廣場(chǎng)裝修工程施工組織設(shè)計(jì).doc
進(jìn)入下載頁(yè)
第一章 施工組織方案簡(jiǎn)介
一、工程概況
(一)工程名稱:
大邊大邊大東海佳新廣場(chǎng)裝修工程
(四)工程地點(diǎn):
大邊市榆亞大道在東海購(gòu)物公園內(nèi)
(一)工程規(guī)模:
本工程建筑基底面積約為4300m2,總建筑面積約為21000m2,建筑層數(shù)為5層框架結(jié)構(gòu)。
(四)本次招標(biāo)范圍:
1、根據(jù)招標(biāo)文件及初步設(shè)計(jì)圖紙,聯(lián)系并安排在大邊當(dāng)?shù)鼐邆湎鄳?yīng)設(shè)計(jì)資質(zhì)(包括裝飾裝修、給排水、電氣工程等資質(zhì))的設(shè)計(jì)院實(shí)施施工圖的繪制出圖。
2、實(shí)施相應(yīng)工程項(xiàng)目的務(wù)類向政府部門(mén)的報(bào)批、報(bào)驗(yàn)等工作,直至將本項(xiàng)目提交業(yè)主使用。
3、室內(nèi)工程
① 給排水工程(廣場(chǎng)給排水工程不包括在內(nèi))。
② 商場(chǎng)內(nèi)燃?xì)夤こ獭?br />
③ 電氣工程,包括商場(chǎng)內(nèi)進(jìn)線電纜、管線、燈具、開(kāi)關(guān)插座等供應(yīng)和安裝(廣場(chǎng)插座工程不包括在內(nèi))。
④ 空調(diào)機(jī)房所有進(jìn)線電纜、橋架及燈具、插座,一臺(tái)生活水泵、一臺(tái)氣壓罐的電氣控制箱及控制線路(機(jī)房?jī)?nèi)空調(diào)設(shè)備控制柜及其控制管線不包括在內(nèi))。
⑤ 電腦、通信及電話系統(tǒng)(排管、
Chapter Introduction Construction Plan
First, project survey
(A) Project name:
Side of the big big big new plaza renovation works best the East China Sea
(D) Project location:
Yuya Avenue, the big city shopping parks in the East China Sea
(A) size of the project:
The engineering and construction base area of about 4300m2, total construction area is about 21000m2, building layers of 5 story frame structure.
(D) the scope of this tender:
1, according to tender documents and preliminary design drawings, contact and arrange in the big local design with the appropriate qualifications (including decoration, water supply and drainage, electrical engineering qualification) and Design Institute of mapping out the implementation of construction plans.
2, the implementation of the corresponding service class project to the government's approval, inspection, etc., until the owners to use this item to.
3, indoor projects
① Water Supply and Drainage Project (square to the drainage works are not included).
② mall gas project.
③ electrical engineering, including shopping malls into the line of cables, pipes, lamps, switches, sockets, supply and installation of (square socket works not included).
④ air into the room all the cables, trays and lamps, sockets, a living water pump, a pressure tank of the electric control boxes and control lines (the engine room air-conditioning control cabinet and control lines are not included).
⑤ computer, communications and telephone systems (pipes,
