• <cite id="c40i8"></cite>
    1. 午夜福利精品国产二区,欧美日韩在线亚洲二区综二,国产不卡精品视频男人的天堂,女人18片毛片60分钟,亚洲色成人网站www永久四虎,日本一卡2卡3卡四卡精品网站 ,水蜜桃视频在线观看免费18,一区二区三区av在线观看
      建虎網 節省時間成本,讓工作學習變得更高效!m.worldcc.cn

      預應力橋圖紙.dwg

      更新時間: 2024-03-02
      下載權限: 免費會員
      文件大小: 0.75 MB
      文件類型: .dwg
      瀏覽次數:
      上傳會員: 龍龍
      所屬欄目: 路橋圖紙
      進入下載頁
      資料簡介

      2008-10/預應力橋圖紙.rar一、設計依據
      1.公路橋涵設計通用規范(JTJ021-89)。
      2.公路鋼筋混凝土及預應力混凝土橋涵設計規范(JTJ023-85)。
      3.公路橋涵地基與基礎設計規范(JTJ024-85)。
      二、基本情況
      ***橋是在**公路***1號橋的內側加寬8.1m形成:2×0.55(安全帶)+2×7.0m (行車道)+1.5m(中央分隔帶)的新橋。我院于99年6月底對該橋位進行了橋位測量,測得老橋起訖點樁號為:K0+041.12~K0+134.67(假定樁號);新加寬部分的起訖點樁號為:K0+060.39~K0+131.716,其技術標準:
      橋面凈空:凈-7+2×0.55m
      設計荷載:汽車-20級,掛車-100
      橋面縱坡:0%;橫坡:1.5%(單向)
      橋位場區地震裂度小于規范要求,未考慮地震設防。
      三、地質情況
      甲方未提供橋位處的地質資料,但兩岸均有明顯的片麻巖露頭。設計要求橋臺基礎底面應置于承載能力不小于1Mpa的新鮮巖石面上,若施工開挖到設計標高后無法滿足設計要求的承載能力,請施工單位和甲方務必通知設計單位,以便采取措施解決。
      四、橋型結構
      First, design basis
      1. General Highway Bridge Design Specification (JTJ021-89).
      2. Reinforced concrete and prestressed concrete highway bridges and culverts (JTJ023-85).
      3. Highway Bridge Design Code base and foundation (JTJ024-85).
      Second, the basic situation
      *** *** Road Bridge is No. 1 in ** the inside of the bridge widening 8.1m form: 2 × 0.55 (seat belt) +2 × 7.0m (lane) +1.5 m (median) of new Bridge. Our hospital in 99 years by the end of June to the bridge site for the bridge position measurement, the measured Stake for the Old Bridge Ends: K0 +041.12 ~ K0 +134.67 (assuming Stake); new widened as part of the Ends Stake : K0 +060.39 ~ K0 +131.716, its technical standards:
      Bridge clearance: Net -7 +2 × 0.55m
      Design load: Automotive -20 level, trailers -100
      Deck Longitudinal: 0%; cross slope: 1.5% (one-way)
      Bridge location field earthquake intensity zone is less than specifications, are not considered earthquake fortification.
      Third, geological conditions
      Party did not provide the bridge is located at the geological data, but both sides have had significant gneiss outcrops. Design requirements should be placed in the underside of abutment foundation bearing capacity of not less than 1Mpa fresh rock surface, if after the excavation to the design level can not meet the design requirements of carrying capacity, please be sure to notify the construction unit and design unit Party to take measures to address.
      4, the bridge structure
       

      下載地址

      前往下載

      主站蜘蛛池模板: 免费人成再在线观看视频| 手机av中文字幕| 鲁一鲁AV| 欧美人与动zozo在线播放| 人妻激情乱人伦视频| 无码中文字幕精品推荐| 中国猛少妇色xxxxx| 亚洲一精品一区二区三区| 久久精品亚洲作者| 黄片网址| 韩国无码AV片午夜福利| 中文久久久无码| 免费人妻一二三区视频网站| 久久久综综合色一本伊人| 国产精品人成在线播放蜜臀 | 影音先锋男人资源网站| av日韩精品在线播放| 久久官方婷婷| 婷婷99狠狠躁天天躁中| 日韩中文字幕视频一区| 亚洲精品香蕉一区二区| 丁香六月婷婷久久综合| 成人性生交片无码免费看| 精品国产一区av天美传媒| av超碰| 欧美成97爱| 亚洲人成电影在线天堂色| 精品少妇后入一区二区三区| 色色成人网| 插穴网站| 99r精品| 黄色一级片一区二区三区| 制服丝袜在线不卡| 91色老久久精品偷偷蜜臀| 国产老熟妇| 激情啪啪啪一区二区三区| 天天插天天爽| 亚洲VA无码VA在线VA天堂| 亚洲伊人天天色| 亚洲aⅴ男人的天堂在线观看| 香港三级欧美国产精品|