      交底內容:
      1、在鋪筑級配碎石底基層(墊層)前,應從填筑好的路基上將所有浮土、雜物清除干凈,并嚴格整形和壓實使其符合設計圖紙要求。
      2、路床表面上的車轍或松軟部分和壓實不足的地方以及任何不符合規(guī)定要求的表面都應翻松、清除或摻填同類材料重新進行整修碾壓,使其達到本標段技術規(guī)范的相關技術要求。
      3、 施工前對路基進行復驗,同時保證路基排水設施的完好。
      4、 恢復中線測量:直線段每20~25m設一樁,平曲線每10~15m設一樁。
      5、碾壓:采用12T以上壓路機碾壓,碾壓方向均應與中心平行,其碾壓順序一般是:直線段由邊到中,超高段由內側向外側,依次連續(xù)均勻進行碾壓。碾壓時,后輪重疊1/2輪寬,使每個攤鋪碾壓層整個厚度和寬度完全均勻地壓實到規(guī)定的壓實度為止。壓實后表面平整、無輪跡或隆起,并有正確的斷面和適當的路拱。壓實機碾壓速度的控制,頭兩遍以采用1.5~1.7Km/h為宜,以后用2.0~2.5Km/h。壓路機壓不到的地方,用機夯實直到達到規(guī)定的密實度為止。
      7、碾壓后墊層表面應平整、堅實、無粗細料局部集中現象,碾壓輪跡深度不得大于5mm。否則已施工的碎石墊層需再次碾壓到設計要求為止。
      Cards on the table contents:
      1 graded gravel in the pavement sub-base (cushion) before, we should start filling all surface dust will be a good foundation, debris cleared away, and shaping and compaction to meet stringent design requirements of the drawings.
      2, road bed surface rutting or soft parts and compaction deficiencies and does not meet the requirements of any surface should be turned loose, clear or mixed with similar material to re-fill the renovation rolling, to achieve the technical specification of the tenders the relevant technical requirements.
      3, before the construction of the roadbed for retesting, while ensuring good subgrade drainage.
      4, restoration of midline measurement: 20 ~ 25m straight line set up one of each, every 10 ~ 15m horizontal curve set 1.
      5, RCC: RCC with 12T or more rollers, rolling direction should be parallel with the center, the RCC is generally the order: straight line from the edge to their middle and high section from the medial to lateral, followed by a continuous and even to grind Pressure. RCC, the rear overlap 1 / 2 wide, so that the whole thickness of each layer of paving and compaction and compaction width completely evenly up to the required degree of compaction. After compaction the surface smooth, no wheel track or uplift, and the correct and proper camber section. Compactor rolling speed control, head twice to use 1.5 ~ 1.7Km / h is appropriate, after using 2.0 ~ 2.5Km / h. Roller pressure less than the local, with machines up to achieve the required compaction density far.
      7, after the cushion surface should be smooth rolling, solid, non-weight material of local concentration, the depth of compacted wheel tracks no larger than 5mm. Otherwise have been required to re-construction of the gravel bedding layer compacted to the design requirement.
       

      下載地址

      前往下載

      主站蜘蛛池模板: 久久99精品这里精品动漫6| 精品亚洲AⅤ无码午夜在线| 人妻在线网站| 久久亚洲精品日韩蜜桃| 欧洲精品码一区二区三区| 一本一道久久综合狠狠老| 91美女在线观看| 激情综合色五月丁香六月亚洲| 狠狠色婷婷久久综合频道日韩| 亚欧成人精品一区二区乱| 亚洲综合色婷婷中文字幕| 人妻久久久| 一起草av| 欧美日韩一线| 会昌县| 欧美乱人伦中文字幕在线不卡| 亚洲精品一区二区三区蜜| 国产精品无码AV| 欧美日韩亚洲中文字幕二区| 中文一区二区视频| 久久精品国产大片免费观看| 醴www,亚洲熟女,Com| 亚洲三级香港三级久久| 国产日韩一区二区三免费高清| 欧美经典人人爽人人爽人人片| 欧美日韩精品一区二区三区不卡 | 国产精品女人呻吟在线观看| 久久综合精品不卡一区二区| 亚洲精品美女久久久久9999| 色五月?中文字幕| 国产精品白浆无码流出在线看| A片网| 91社区在线| 重口SM一区二区三区视频| 国产区图片区小说区亚洲区| 亚洲一区二区三区在线| 日日碰狠狠躁久久躁96avv| 精品亚洲高潮喷水精品视频| 永久免费在线成人大片| 一区二区三区av在线观看 | 国产一区二区三精品久久久无广告|