      安全交底內容:
      1、 必須按施工組織設計進行施工。
      2、 搭設、拆除腳手架必須戴安全帽及穿軟底鞋。
      3、 外墻腳手架必須在主體結構施工以前搭設,并按照有關規定搭設安全檔板或者安全網;腳手架應高出工作面1.2M以上。
      4、 用于連接大橫桿的對接扣件,應避免開口向上設置,防止雨水侵入。
      5、 腳手架分段或搭設完畢,須經施工負責人、質安員驗收合格后,方可使用;高層建筑的外墻腳手架要采取卸荷措施。
      6、 在大風雨或停工一段時間后、應對腳手架進行全面檢查,如發現變形、下沉、鋼構件銹蝕嚴重,連接扣松脫等,要及時加固維修后方可使用。
      7、 拆除腳手架應設圍欄,拆除工作應由上而下,一步一清,不準上下同時作業,拆除物件不得往下投擲。
      8、 拆除大橫桿、剪刀撐時應先拆中間扣,再拆兩頭扣,由中間操作人員往下順傳竹桿。
      9、 遇大雨、雷、五級以上及夜間不得作業。
      用Φ6鋼筋預埋砼梁外邊,每3米水平設一道,待砼梁板拆除后,收緊鋼筋,再加回頭頂。
      Security cards on the table contents:
      1, must be constructed according to the construction organization design.
      2, erection, dismantling scaffolds must wear a helmet and wear soft-soled shoes.
      3, external scaffolding prior to erection of the main structure of the construction and erection of security in accordance with relevant provisions of the tailgate or the safety net; scaffold should be higher than face 1.2M.
      4, a large bar for connecting the docking fasteners, should be set up to avoid openings to prevent water intrusion.
      5, section or scaffolding erection is completed, subject to construction of person in charge of quality inspection and acceptance by security guards only after use; high-rise building external scaffolding unloading measures to be taken.
      6, when the storm or after a period of suspension of work, scaffolding should conduct a comprehensive inspection, if found deformation, subsidence, severe corrosion of steel components, connecting buckle loose, they have to be repaired in time to use reinforcement.
      7, removal of the fence should be set up scaffolding, demolition work should be top-down, step one clear, closed down operations at the same time, removal of objects not throw down.
      8, removal of a large bar, scissors should be removed first, middle button, and then split two buttons, the operator by the middle pass down the smooth bamboo.
      9, heavy rains, thunder, and night shall not work more than five.
      Reinforced concrete beam embedded with Φ6 outside, set a level of 3 meters each, to be removed after the concrete slab, to tighten the steel, coupled back to top of the head.
       

      下載地址

      前往下載

      主站蜘蛛池模板: 亚洲精品tv久久久久久久久久| 一区色| 综合色区亚洲熟女妇p| 制服丝袜亚洲在线| 无码AV中文字幕久久专区| 国产精品麻豆成人AV电影艾秋| 国产91精品对白露脸全集观看| 中文人妻不卡| 久久av高潮av喷水av无码| 亚洲欧洲日产国码无码av野外| 午夜影院福利社| 国产精品va在线观看手机版| 亚洲最大成人av在线天堂网| 成人性色生活片免费毛片| 欧美欧美欧美久久久久三区| 日本中文字幕有码在线| 色爱综合另类图片av| 欧美牲交视频| 无码人妻一区二区三区四区老鸭窝| 亚洲精彩视频在线观看| 九九热免费精品视频在线| 亚洲精品熟女一区二区| 中文字幕丝袜精品久久| 91精品网站天堂系列在线播放| 欧美综合自拍亚洲综合图| 性色av不卡一区二区三区| 性无码专区无码| 久久精品国产亚洲AV品善| 最新亚洲人AV日韩一区二区| 亚洲国产精品久久久久秋霞| 精品人妻一区介绍| 平塘县| 亚洲成人日韩av一区| 99久久亚洲综合精品成人网| 富婆熟妇熟女二区三区| 日韩精品人妻系列无码| 亚洲国产日韩精品自拍| 美日韩在线视频一区二区三区 | 久热香蕉精品视频在线播放| 无码熟妇人妻av影音先锋| 欧美3p视频|