      §1  工 程 概 況

           高樓公路橋,設在高樓渡槽首部,位于高樓渡槽0#線至1#線之間,架立于高樓渡槽1#槽身之上,是高樓渡槽為解決省道57線(青岱線)跨越槽身而設置的一個小型附屬橋梁工程。高樓公路橋按汽--20、掛—100,橋面凈寬8.60M設計。橋寬為9M,橋長為12M,采用裝配式鋼筋砼空心橋面板,兩側設鋼筋混凝土防撞欄桿,橋面頂高程為22.068M,與原公路以5%縱坡相連接,橋兩側填筑路面每邊各長50M,寬9M,靠高樓鄉政府側路面澆20CM厚250#砼,靠大京鎮側路面鋪18CM厚熱瀝青拌碎石。橋臺采用鉆孔樁雙柱式鋼筋砼結構,樁徑D=1.0M,樁長6.465-15.46M,樁體型式為端承樁,樁尖均伸入強風化下限基巖面50CM以上。

       

      §2  施工方案簡述
      一、 地基開挖與基礎工程
          灌注樁施工共分四個過程:鉆孔、清孔、鋼筋籠制作安裝、澆灌水下砼。
          其一,鉆孔,共分六個步驟。
      (1)、準備工作;
          ⑵、鋼護筒埋設;
      § 1 Engineering Overview

           High-rise bridge, located in the tower's first aqueduct, aqueduct in the high-rise buildings to 1 # 0 # lines between the lines, frame stand tall above the aqueduct body # 1 slot, is to address the provincial highway 57 high-rise aqueduct line (green Dai line) across Aqueduct and set up a small subsidiary of Bridge Engineering. Tall highway bridge by steam - 20, linked to -100, deck net width 8.60M design. Bridge width 9M, bridge length of 12M, the assembled hollow reinforced concrete bridge decks, reinforced concrete crash bars located on both sides of the bridge deck elevation as the top 22.068M, with the original road longitudinal slope of 5% is connected to the bridge on both sides length on each side of the road embankment 50M, W 9M, high-rise township government side of the road by pouring 20CM 250 # thick concrete, the town side of the road by a large shop in Beijing 18CM thick hot asphalt mix gravel. Abutment piles by drilling two columns of reinforced concrete structures, pile diameter D = 1.0M, pile length 6.465-15.46M, pile size type as the pile, pile tip are inserted into the weathered bedrock surface 50CM floor above.

       

      § 2 Construction program brief
      1, foundation excavation and foundation engineering
          Pile is divided into four processes: drilling, clean hole, reinforcement cage fabrication and installation, irrigation underwater concrete.
          First, drilling, consists of six steps.
      (1), preparatory work;
          ⑵, Steel Casing;
       

      下載地址

      前往下載

      主站蜘蛛池模板: 国产一区二区在线激情往| 人妻在线无码一区二区三区| 无码AV网站| 中文字幕亚洲综合小综合在线| 亚洲一区二区三区人妻天堂| 超碰人人草人人色| 成人无码在线视频区| 国产精品爱久久久久久久| 老司机亚洲精品影院| 日本V视频| 爱性久久久久久久久| 亚洲欧洲一区二区免费| 乱精品一区字幕二区| www.91.xxx| 婷婷色香五月综合缴缴情香蕉| 亚洲欧美综合| 性欧美乱妇come| 中文久久久无码| 亚洲欧美国产日韩天堂区| 日本国产精品第一页久久| 暖暖 免费 在线 中文日本| 97超碰人人| 久久久av男人的天堂| 99久久精品国产一区| 国内精品自线在拍| 无码免费一区二区三区| 国产精品有码无码AV在线播放| 精品乱伦| 国内自拍视频在线一区| 日韩 高清 无码 人妻| 亚洲中文字幕精品一区二区三区| 亚洲一区二区乱码精品| 精品综合久久久久久97| 两女女百合互慰av赤裸无遮挡 | 在线亚洲视频网站www色| 熟女丝袜av| 在线日韩日本国产亚洲| 久久婷婷激情综合色综合俺也去| 亚洲aⅴ无码天堂在线观看 | 三上悠亚日韩精品二区| 亚洲中文无码线在线观看|