      現(xiàn)澆箱梁掛籃施工方案

      叉河特大橋位于K104+242位置處,為左右分離式,其中左幅布置形式為為25+75+130+75+3×25m,右幅布置形式為75+130+75+3×25m的箱型變截面預(yù)應(yīng)力T型連續(xù)剛構(gòu)橋,箱梁根部高7.5m,跨中高2.6m,箱梁高為梁中線位置的高度,邊中跨比較小為0.5769,這樣將有利于箱梁內(nèi)的應(yīng)力合理分布,左右側(cè)高度不一,臂長(zhǎng)度為3.5m。
          施工中需要隨時(shí)對(duì)掛籃懸吊系統(tǒng)進(jìn)行調(diào)整,箱梁底板按照R=351.659m變化,底板頂面按照R=391.092m變化,系按照?qǐng)A曲線變化,這樣設(shè)計(jì)的目的是減少墩頂?shù)膹澗財(cái)?shù)值,相應(yīng)減少主梁內(nèi)的主拉應(yīng)力。箱梁采取掛籃懸臂澆筑施工,最大施工懸臂長(zhǎng)度為58.5m,最大懸澆重量為142.9t,按照設(shè)計(jì)的施工順序?yàn)?先在墩身托架上澆筑0#段,后向兩邊逐段懸臂澆筑并張拉預(yù)應(yīng)力束,先邊跨合攏,再中跨合攏,整個(gè)施工過(guò)程相鄰澆筑節(jié)段對(duì)稱(chēng)進(jìn)行。和攏時(shí)橋梁由T形靜定懸臂狀態(tài)變?yōu)槌o定狀態(tài),實(shí)現(xiàn)了體系轉(zhuǎn)換。
      砼采用拌合站集中拌制,利用HBT-60型混凝土輸送泵垂直泵送進(jìn)行箱梁施工.在左2#(右1#)及左3#(右2#)墩柱位置各布置8t塔吊1臺(tái)垂直運(yùn)輸材料、小型設(shè)備、機(jī)具等。
      叉河特大橋施工總工期控制在25個(gè)月內(nèi)。階段目標(biāo)為:2005年5月前完成樁基礎(chǔ)施工,2005年11月前完成墩柱施工,2006年10月前完成T構(gòu)懸
      Cradle Cast construction plan

      Fork River Bridge at K104 +242 position of Department, separate left and right, which left for the site layout for the 25 +75 +130 +75 +3 × 25m, the right site layout for the 75 +130 +75 +3 × 25m of Box T-tapered prestressed continuous rigid frame bridge, box girder high root 7.5m, high span 2.6m, height box beam midline height of the cross-border small as 0.5769, this will be beneficial in Box reasonable distribution of the stress and left side, different height, arm length is 3.5m.
          Construction needs to be kept on the cradle suspension system to adjust, bottom slab in accordance with the R = 351.659m change, the top floor in accordance with R = 391.092m change system in accordance with the circular curve, it is designed to reduce the pier top moment value, a corresponding reduction in the main beam in the main tensile stress. Cantilever box beam construction to Cradle, the biggest construction boom length of 58.5m, the largest Cantilever weight 142.9t, according to the design of the construction sequence is: first pier bracket placement 0 # section, then paragraph by paragraph to both sides of the cantilever placement and prestressed beam, the first Cross Close, and then the cross-fold, the entire construction process symmetric to the adjacent segment placement. And the rope bridge by the T-shaped when Static cantilever into indeterminate state, to achieve a system conversion.
      Concentration by mixing concrete mixing plant, using HBT-60-type concrete pump vertical pump for box girder. # 2 in the left (right 1 #) and left 3 # (right 2 #), position the layout of 8t crane Pier 1 set of vertical transport of materials, small equipment, machinery and so on.
      Fork River bridge construction control the total duration of 25 months. Stage goal: in May 2005 to complete construction of pile foundation, in November 2005 before the completion of pier construction, completed in October 2006 suspended T structure
      Cradle Cast construction plan

      Fork River Bridge at K104 +242 position of Department, separate left and right, which left for the site layout for the 25 +75 +130 +75 +3 × 25m, the right site layout for the 75 +130 +75 +3 × 25m of Box T-tapered prestressed continuous rigid frame bridge, box girder high root 7.5m, high span 2.6m, height box beam midline height of the cross-border small as 0.5769, this will be beneficial in Box reasonable distribution of the stress and left side, different height, arm length is 3.5m.
          Construction needs to be kept on the cradle suspension system to adjust, bottom slab in accordance with the R = 351.659m change, the top floor in accordance with R = 391.092m change system in accordance with the circular curve, it is designed to reduce the pier top moment value, a corresponding reduction in the main beam in the main tensile stress. Cantilever box beam construction to Cradle, the biggest construction boom length of 58.5m, the largest Cantilever weight 142.9t, according to the design of the construction sequence is: first pier bracket placement 0 # section, then paragraph by paragraph to both sides of the cantilever placement and prestressed beam, the first Cross Close, and then the cross-fold, the entire construction process symmetric to the adjacent segment placement. And the rope bridge by the T-shaped when Static cantilever into indeterminate state, to achieve a system conversion.
      Concentration by mixing concrete mixing plant, using HBT-60-type concrete pump vertical pump for box girder. # 2 in the left (right 1 #) and left 3 # (right 2 #), position the layout of 8t crane Pier 1 set of vertical transport of materials, small equipment, machinery and so on.
      Fork River bridge construction control the total duration of 25 months. Stage goal: in May 2005 to complete construction of pile foundation, in November 2005 before the completion of pier construction, completed in October 2006 suspended T structure
      Cradle Cast construction plan

      Fork River Bridge at K104 +242 position of Department, separate left and right, which left for the site layout for the 25 +75 +130 +75 +3 × 25m, the right site layout for the 75 +130 +75 +3 × 25m of Box T-tapered prestressed continuous rigid frame bridge, box girder high root 7.5m, high span 2.6m, height box beam midline height of the cross-border small as 0.5769, this will be beneficial in Box reasonable distribution of the stress and left side, different height, arm length is 3.5m.
          Construction needs to be kept on the cradle suspension system to adjust, bottom slab in accordance with the R = 351.659m change, the top floor in accordance with R = 391.092m change system in accordance with the circular curve, it is designed to reduce the pier top moment value, a corresponding reduction in the main beam in the main tensile stress. Cantilever box beam construction to Cradle, the biggest construction boom length of 58.5m, the largest Cantilever weight 142.9t, according to the design of the construction sequence is: first pier bracket placement 0 # section, then paragraph by paragraph to both sides of the cantilever placement and prestressed beam, the first Cross Close, and then the cross-fold, the entire construction process symmetric to the adjacent segment placement. And the rope bridge by the T-shaped when Static cantilever into indeterminate state, to achieve a system conversion.
      Concentration by mixing concrete mixing plant, using HBT-60-type concrete pump vertical pump for box girder. # 2 in the left (right 1 #) and left 3 # (right 2 #), position the layout of 8t crane Pier 1 set of vertical transport of materials, small equipment, machinery and so on.
      Fork River bridge construction control the total duration of 25 months. Stage goal: in May 2005 to complete construction of pile foundation, in November 2005 before the completion of pier construction, completed in October 2006 suspended T structure
      Cradle Cast construction plan

      Fork River Bridge at K104 +242 position of Department, separate left and right, which left for the site layout for the 25 +75 +130 +75 +3 × 25m, the right site layout for the 75 +130 +75 +3 × 25m of Box T-tapered prestressed continuous rigid frame bridge, box girder high root 7.5m, high span 2.6m, height box beam midline height of the cross-border small as 0.5769, this will be beneficial in Box reasonable distribution of the stress and left side, different height, arm length is 3.5m.
          Construction needs to be kept on the cradle suspension system to adjust, bottom slab in accordance with the R = 351.659m change, the top floor in accordance with R = 391.092m change system in accordance with the circular curve, it is designed to reduce the pier top moment value, a corresponding reduction in the main beam in the main tensile stress. Cantilever box beam construction to Cradle, the biggest construction boom length of 58.5m, the largest Cantilever weight 142.9t, according to the design of the construction sequence is: first pier bracket placement 0 # section, then paragraph by paragraph to both sides of the cantilever placement and prestressed beam, the first Cross Close, and then the cross-fold, the entire construction process symmetric to the adjacent segment placement. And the rope bridge by the T-shaped when Static cantilever into indeterminate state, to achieve a system conversion.
      Concentration by mixing concrete mixing plant, using HBT-60-type concrete pump vertical pump for box girder. # 2 in the left (right 1 #) and left 3 # (right 2 #), position the layout of 8t crane Pier 1 set of vertical transport of materials, small equipment, machinery and so on.
      Fork River bridge construction control the total duration of 25 months. Stage goal: in May 2005 to complete construction of pile foundation, in November 2005 before the completion of pier construction, completed in October 2006 suspended T structure
      Cradle Cast construction plan

      Fork River Bridge at K104 +242 position of Department, separate left and right, which left for the site layout for the 25 +75 +130 +75 +3 × 25m, the right site layout for the 75 +130 +75 +3 × 25m of Box T-tapered prestressed continuous rigid frame bridge, box girder high root 7.5m, high span 2.6m, height box beam midline height of the cross-border small as 0.5769, this will be beneficial in Box reasonable distribution of the stress and left side, different height, arm length is 3.5m.
          Construction needs to be kept on the cradle suspension system to adjust, bottom slab in accordance with the R = 351.659m change, the top floor in accordance with R = 391.092m change system in accordance with the circular curve, it is designed to reduce the pier top moment value, a corresponding reduction in the main beam in the main tensile stress. Cantilever box beam construction to Cradle, the biggest construction boom length of 58.5m, the largest Cantilever weight 142.9t, according to the design of the construction sequence is: first pier bracket placement 0 # section, then paragraph by paragraph to both sides of the cantilever placement and prestressed beam, the first Cross Close, and then the cross-fold, the entire construction process symmetric to the adjacent segment placement. And the rope bridge by the T-shaped when Static cantilever into indeterminate state, to achieve a system conversion.
      Concentration by mixing concrete mixing plant, using HBT-60-type concrete pump vertical pump for box girder. # 2 in the left (right 1 #) and left 3 # (right 2 #), position the layout of 8t crane Pier 1 set of vertical transport of materials, small equipment, machinery and so on.
      Fork River bridge construction control the total duration of 25 months. Stage goal: in May 2005 to complete construction of pile foundation, in November 2005 before the completion of pier construction, completed in October 2006 suspended T structure
      Cradle Cast construction plan

      Fork River Bridge at K104 +242 position of Department, separate left and right, which left for the site layout for the 25 +75 +130 +75 +3 × 25m, the right site layout for the 75 +130 +75 +3 × 25m of Box T-tapered prestressed continuous rigid frame bridge, box girder high root 7.5m, high span 2.6m, height box beam midline height of the cross-border small as 0.5769, this will be beneficial in Box reasonable distribution of the stress and left side, different height, arm length is 3.5m.
          Construction needs to be kept on the cradle suspension system to adjust, bottom slab in accordance with the R = 351.659m change, the top floor in accordance with R = 391.092m change system in accordance with the circular curve, it is designed to reduce the pier top moment value, a corresponding reduction in the main beam in the main tensile stress. Cantilever box beam construction to Cradle, the biggest construction boom length of 58.5m, the largest Cantilever weight 142.9t, according to the design of the construction sequence is: first pier bracket placement 0 # section, then paragraph by paragraph to both sides of the cantilever placement and prestressed beam, the first Cross Close, and then the cross-fold, the entire construction process symmetric to the adjacent segment placement. And the rope bridge by the T-shaped when Static cantilever into indeterminate state, to achieve a system conversion.
      Concentration by mixing concrete mixing plant, using HBT-60-type concrete pump vertical pump for box girder. # 2 in the left (right 1 #) and left 3 # (right 2 #), position the layout of 8t crane Pier 1 set of vertical transport of materials, small equipment, machinery and so on.
      Fork River bridge construction control the total duration of 25 months. Stage goal: in May 2005 to complete construction of pile foundation, in November 2005 before the completion of pier construction, completed in October 2006 suspended T structure
      Cradle Cast construction plan

      Fork River Bridge at K104 +242 position of Department, separate left and right, which left for the site layout for the 25 +75 +130 +75 +3 × 25m, the right site layout for the 75 +130 +75 +3 × 25m of Box T-tapered prestressed continuous rigid frame bridge, box girder high root 7.5m, high span 2.6m, height box beam midline height of the cross-border small as 0.5769, this will be beneficial in Box reasonable distribution of the stress and left side, different height, arm length is 3.5m.
          Construction needs to be kept on the cradle suspension system to adjust, bottom slab in accordance with the R = 351.659m change, the top floor in accordance with R = 391.092m change system in accordance with the circular curve, it is designed to reduce the pier top moment value, a corresponding reduction in the main beam in the main tensile stress. Cantilever box beam construction to Cradle, the biggest construction boom length of 58.5m, the largest Cantilever weight 142.9t, according to the design of the construction sequence is: first pier bracket placement 0 # section, then paragraph by paragraph to both sides of the cantilever placement and prestressed beam, the first Cross Close, and then the cross-fold, the entire construction process symmetric to the adjacent segment placement. And the rope bridge by the T-shaped when Static cantilever into indeterminate state, to achieve a system conversion.
      Concentration by mixing concrete mixing plant, using HBT-60-type concrete pump vertical pump for box girder. # 2 in the left (right 1 #) and left 3 # (right 2 #), position the layout of 8t crane Pier 1 set of vertical transport of materials, small equipment, machinery and so on.
      Fork River bridge construction control the total duration of 25 months. Stage goal: in May 2005 to complete construction of pile foundation, in November 2005 before the completion of pier construction, completed in October 2006 suspended T structure
       

      下載地址

      前往下載

      主站蜘蛛池模板: 久久精品aⅴ无码中文字字幕重口 一区二区三区高清视频国产女人 操丝袜美腿在线播放网站上 | av亚洲日韩| 亚洲一区二区三区久久受| 亚洲v欧美v国产v在线观看| 国内精品久久久久久久齐齐| 久久国产精99精产国高潮| 在线看无码的免费网站| 91精品亚洲熟妇少妇任你躁 | 1024国产基地| 乌兰察布市| 亚洲1区二区三区麻豆| 国产一区二区三区精美视频| 伊人久久精品无码麻豆精品| 在线视频?日韩一区| 综合五月网| 重口SM一区二区三区视频 | 思思久99久女女精品| 亚洲精品久久久久国色天香| 老太婆性杂交视频| 国产福利一区二区写真| 四虎永久在线精品无码视频| 亚洲高清成人av在线| 色爱综合网| 久久精品一品道久久精品| 中文字幕在线日韩| 国产精品亚洲а∨天堂2021| 日韩中文人妻无码不卡| 美女视频黄频大全免费| 亚洲国产长腿丝袜av天堂| 你懂的在线视频一区二区| jizz喷水外围| 夜鲁鲁鲁夜夜综合视频| 天天综合色天天综合网| 欧美乱码卡一卡二卡四卡免费| 女人被狂躁到高潮视频免费动态图| 欧美18禁网站国外| 国产香蕉精品视频一区二区三区| 国产精品免费中文字幕| 中日韩在线| 国产精品白浆一区二小说| 亚洲中文字幕综合一区|