      旋挖鉆樁基礎施工方案 旋挖鉆樁基施工方案
      一、 工程概況
       某分離式立交橋為雙向雙幅四車道預應力簡支梁結構,起止樁號為K12+425.29~K13+090.71,共計665.42m,即從1#橋臺至34#橋臺共34跨。2002年9月業主對該橋進行了一次重大設計變更,將34#橋臺至另一標段1#橋臺段原設計的填土路基修改為高架橋,兩端之間增加40跨高架橋,橋梁總長變更為74跨。下構墩柱基礎為系梁,每半幅系梁基礎均為兩根直徑1500mm的鉆孔灌注樁,共計增加路改橋160根樁,樁基為25#砼,樁長為26.8米。
      二、 施工前現場處理平面布置圖(見附圖1)   
      路改橋段設計修改前為填土路基,其原地面全為魚塘和低洼稻田,且正式設計修改前對路基范圍內的7個魚塘已進行了清淤換填砂卵石,換填高度超出地下水位接近施工便道的頂面,后業主方要求將已回填好的砂卵石約3萬方全部挖出來運到另一處作為回填材料,這樣該段設計路改橋后原地形又恢復為原來的7個魚塘和低洼地。進行橋梁下構施工前必須對場地進行處理,考慮到旋挖鉆機設備自重較重接近80噸,為保證鉆孔施工的樁位準確性和設備的安全性,對場地處理的回填料必須慎重選擇,考慮到附近沒有好的土源,到路基取土場取土考慮其成本又太高
      Pile Foundation Construction Rotary drilling program Rotary Drilling Pile Foundation Construction Programme
      First, project survey
       Overpass of a separate four-lane two-way dual-rate structure of prestressed beams, beginning and ending Stake for the K12 +425.29 ~ K13 +090.71, a total of 665.42m, from 1 # to 34 # bridge abutment with a total of 34 cross. September 2002 the owners of the bridge was a major design change, the abutment 34 # 1 # Bridge Lot to another section of the original design of the filling station was revised to elevated roadbed, an increase of 40 across the viaduct between the two ends of the bridge length changed to 74 cross. Under the pier base and beam structure, the basis of each Banfu tie beam are two 1500mm diameter bored piles for a total increase of 160 Road Reconstruction and Bridge piles, pile of 25 # concrete, pile length is 26.8 meters.
      Second, dealing with pre-construction site layout plan (see photo 1)
      Road Reconstruction and plot design changes before filling subgrade, the original low-lying ground whole fish ponds and rice fields, and the formal design changes before the foundation of seven ponds within the scope of the dredging has been carried sand and gravel replacement, replacement high Construction of pavement beyond the water table close to the top surface, after the owner's request to have a good sand and gravel backfill all excavated to about 3 of transport to another as a backfill material, so that the design of road section of the bridge after the change has reverted to the original topography The original seven fish ponds and low-lying land. Conducted under the bridge structure before construction on the venues deal, taking into account rotary drilling rig equipment, heavy weight close to 80 tons, in order to ensure the accuracy of Boring Pile and equipment safety, on site processing of the filler must be carefully chosen , taking into account the absence of good soil near the source, to the subgrade soil obtaining dug into account the cost too high
       

      下載地址

      前往下載

      主站蜘蛛池模板: 国产熟女一区二区三区五月婷| 美女胸又大又WWW黄的网站| 亚洲欧洲日产国产 最新| 男女猛烈xx00免费视频试看| 久久天堂夜夜一本婷婷伊人 | 116美女极品a级毛片| 西西444WWW大胆无码视频| 欧美不卡一区| 国内精品久久久久久久久蜜桃| 日韩精品区一区二区三vr| 亚洲色图另类| 风流少妇一区二区三区91| 99热这里只有精品2| 亚洲日韩一区二区| 中文字幕无线码免费人妻| 一本色道久久综合熟妇| 日韩wwww| 免费看男女做好爽好硬视频| 熟妇久久无码人妻av蜜臀www| %91%E9%A9%AC&page=2&orderBy=createTime&expanded=1 | 伊人久久精品久久亚洲一区| 麻豆国产成人AV在线播放| 久久久久无码中| 在线欧美中文字幕农村电影 | 国产足交| 99re6热精品视频在线观看| 黄色三级国产视频无毒| 国产精品一二三区蜜臀av| 一区二区av在线免费| 狠狠亚洲婷婷综合色香五月排名| 蜜桃视频婷婷狼人看在线视频| 午夜福利片一区二区三区| 成人视频XXxx| 久久久久欧美精品| 日韩国产一区二区三区无码| 97久久超碰精品视觉盛宴| 2020国产成人精品视频| 日本亚洲欧洲无免费码在线| 国产九九在线视频| 色偷偷av男人的天堂| 久久精品视香蕉蕉er大臿蕉|