漳州戰(zhàn)備大橋主橋施工方案
1、 工程概況
(略)
2、 下部施工
主橋7#墩為水中墩,為解決基礎(chǔ)施工及上部結(jié)構(gòu)的材料運(yùn)輸,建議設(shè)立從9#—7#墩的施工棧橋,利用棧橋設(shè)立鉆孔平臺,進(jìn)行主橋鉆孔樁及承臺的施工。,
該橋?yàn)榈蜆冻信_,可采用鋼套箱圍堰進(jìn)行施工。即先在工廠進(jìn)行分塊預(yù)制,通過棧橋運(yùn)至墩位拼裝,通過平臺上的起重設(shè)備進(jìn)行下沉。鋼套箱圍堰可采用單雙壁組合式,下沉方法可采用有水吸泥下沉,然后灌注封底混凝土,施工承臺。
3、 上部施工
3、1 0#塊施工
0#塊的施工為支架施工,其臨時墩柱作為主橋懸臂施工的臨時墩,因此,必須具有足夠的強(qiáng)度和剛度,建議采用鋼管混凝土墩柱,下端支撐在承臺或封底混凝土上。
3、2 懸臂段的施工
懸臂段采用掛藍(lán)進(jìn)行施工。掛藍(lán)采用菱形掛藍(lán),在4片腹板處設(shè)4片主桁架,以4米的節(jié)段進(jìn)行澆注。后端錨固于腹板的豎向預(yù)應(yīng)力筋上。
3、3 塔柱的施工
在施工懸臂段的同時,進(jìn)行塔柱的施工。塔柱施工時注意預(yù)埋穿索平臺的預(yù)埋件。
4、 4斜拉索的施工
Zhangzhou program readiness Bridge Construction
1, Project Overview
(Abbreviated)
2, lower construction
7 pier for the main bridge piers in water, the basis for the settlement construction and the upper structure of the material transport, recommended the establishment of 9 # -7 # pier from the construction trestle, trestle used to establish drilling platform, the main bridge bored piles and pile cap construction. ,
Bridge for low pile caps, can be used for construction of steel boxed cofferdam. The first block in the factory prefabricated, transported through the trestle bridge to the piers is assembled, the platform on the lifting equipment to sink. Steel cofferdam can use one set of double-wall combination, sink method can be used sink water suction, and then perfusion of concrete cover, pile cap construction.
3, the upper construction
3,1 0 # block construction
0 # block construction for the stand construction, the temporary pier as a temporary main bridge pier cantilever construction, therefore, must have sufficient strength and stiffness, recommended steel concrete pier supporting the bottom or back cover of concrete in the cap on.
3,2 Cantilever Construction
Cantilever construction carried out by hanging blue. Hanging Basket Hanging Basket with diamond, set in the four webs of the main truss 4 to 4 meters segments were cast. Back-end anchor in the vertical prestressed reinforcement on the web.
3,3 tower construction
Cantilever construction, while for tower construction. Note tower construction embedded embedded parts to wear cable platform.
4, 4 cable construction